700 Remodel
Riverview Greenhouse

 

Leon Lead Greenhouse
Image 2 / Image 3

 

Riverview Basement

 

Image 1 / Image 2

 


Riverview Greenhouse and Shed

 

Image 1 / Image 2

 

Main Campus lower parking lot expansion


September 28, 2009

September 28, 2009

(5/1/09) Image 1, Image 2, Image 3
(5/4/09) Image 1, Image 2, Image 3

 

Childcare Center

 

 

Oct. 6, 2009
Pex piping in the front sidewalk area.

September 28
, image 2, 3, 4, 5, 6, 7, 8, 9, 10
August 27, image 2, 3, 4, 5
July 20
, image 2, 3, 4, 5, 6, 7
July 10, image 2, 3
May 29, image 2, 3.

 

Columbia Center Painting

Image 2

Columbia Education Center Painting Project

 

Bishop Center Floor

Additional Images

Bishop Center floor

 

Riverview Paving and Sport Court Project

Additional Images

Riverview paving project. Click to enlarge.

 

800 Building Facade

800 building facade: click to enlarge
Oct. 7th update


600 Building Abatement

The 600 Building is now history.

Additional Images

600 Building's final days

 

Heavy Equipment Building

The newly painted Heavy Equipment Building now matches the Auto & Welding Building (seen in the background).

Image 2

Heavy Equipment Building

 

 

Grays Harbor College
GRAYS HARBOR COLLEGE
1620 Edward P. Smith Drive
Aberdeen , WA 98520

(360) 532-9020 or toll-free (in WA state) 1-(800) 562-4830
Fax: (360) 538-4299

Off-Campus Locations

Simpson Education Center, Elma: (360) 482-2743
Riverview Education Center, Raymond: (360) 875-9466
Columbia Education Center, Ilwaco: (360) 642-9433
Whiteside Education Center, Aberdeen: (360) 533-9733