Campus Operations - Project Updates
|
|
|
| Riverview Greenhouse |

Image 2 / Image 3
|
| Riverview Basement |
Image 1 / Image 2
|
Riverview Greenhouse and Shed
|
Image 1 / Image 2
|
| Main Campus lower parking lot expansion |

September 28, 2009
(5/1/09) Image 1, Image 2, Image 3
(5/4/09) Image 1, Image 2, Image 3
|
Childcare Center
|

Pex piping in the front sidewalk area.
September 28, image 2, 3, 4, 5, 6, 7, 8, 9, 10
August 27, image 2, 3, 4, 5
July 20, image 2, 3, 4, 5, 6, 7
July 10, image 2, 3
May 29, image 2, 3.
|
Columbia Center Painting
Image 2 |

|
Bishop Center Floor
Additional Images |

|
Riverview Paving and Sport Court Project
Additional Images
|

|
800 Building Facade |


|
600 Building Abatement
The 600 Building is now history.
Additional Images |

|
Heavy Equipment Building
The newly painted Heavy Equipment Building now matches the Auto & Welding Building (seen in the background).
Image 2
|

|

GRAYS HARBOR COLLEGE
1620 Edward P. Smith Drive
Aberdeen
,
WA
98520
(360) 532-9020 or toll-free (in WA
state) 1-(800) 562-4830
Fax: (360) 538-4299
Off-Campus Locations
Simpson Education
Center, Elma: (360) 482-2743
Riverview Education Center, Raymond: (360) 875-9466
Columbia Education Center, Ilwaco: (360) 642-9433
Whiteside Education Center, Aberdeen: (360) 533-9733
|